Türkçe
Mainpage | Site Map
 

DHMI ATC (AIR TRAFFIC CONTROL) EXPERTS TRAINING CENTER, MODERNIZATION OF THE ATC SIMULATOR

     

 

 

 

 

 

 


Kuanta was awarded the Modernization Project of the ATC Simulator in DHMI ATC Experts Training Center in the first quarter of 2006.

Kuanta supplied 28 units of Air Traffic Controller and/or Pilot Controller Console and 3 Dimensional Tower Simulator Systems with complete VCS systems and Radar simulator software. The project was completed at the end of the year 2006

 

ICAO GUIDANCE SIGNS for ISTANBUL ATATÜRK, KAPADOKYA, ERZURUM and DALAMAN AIRPORTS



Kuanta was awarded the DHMI ICAO Guidance Signs tender in 2005 for Istanbul, Kapadokya, Erzurum and Dalaman Airports ICAO Guidance Signs (ICG).
Kuanta supplied 219 ICG to Turkish Ministry of Transportation State Airport Authority (DHMI) in 2006 from OCEM. The FAT of project is planned at the beginning of second half of 2006.

 

 

 

 

SULEYMANIA AIRPORT – IRAQ



Project is completed in August, 2005

• AIRFIELD LIGHTING SYSTEMS
• AFL CONTROL CONSOLES
• ATIS
• AFTN
• DVOR
• IINSTRUMENT LANDING SYSTEM
• DME
• FLIGHT INSPECTION
• TAPE RECORDER
• VOICE COMMUNICATION SYSTEM
• AWOS
• TOWER CONSOLES
• INFRASTRUCTURE
• PROJECT DESIGN
• CONSULTANCY
• ELECTRICAL WORKS
• SHELTERS
• COUNTERPOISE
• TOWER CONSOLES
• X-RAY AND SECURITY SYSTEMS
• AERONAUTICAL FIXED TELECOMMUNICATION NETWORK-AFTN
• INSTALLATION AND COMMISSIONING AND TRAINING

 


ERBIL AIRPORT – IRAQ


Project is completed in July, 2005

• DVOR
• INSTRUMENT LANDING SYSTEM
• DME
• NDB
• FLIGHT INSPECTION
• TAPE RECORDER
• VOICE COMMUNICATION with 3 operator positions
• TOWER CONSOLES
• INFRASTRUCTURE
• PROJECT DESIGN
• CONSULTANCY
• ELECTRICAL WORKS
• INSTALLATION AND COMMISSIONING
• TRAINING

 

 

 VCS SYSTEMS for ANKARA ESENBOGA and ISTANBUL ATATÜRK AIRPORTS – TURKEY


Kuanta was awarded by Turkish Ministry of Transportation State Airport Authority DHMI in 2003 for Ankara – Esenboga and Istanbul – Atatürk Airports Voice Communication Systems and manufacturing of Tower Consoles for both Airports.The project was completed with Schmid Telecommunication AG Company from Switzerland. All installation, cable, cabling and mechanical manufacturing were overcome by Kuanta. The SAT of project was completed at the beginning of 2005. The warranty period is supervised by Kuanta Technical Staff. The project- details of the both airports are; 

ANKARA ESENBOGA AIRPORT TURKEY

• VOICE COMMUNICATION SYSTEM
• TOWER CONSOLES

ISTANBUL ATATURK AIRPORT TURKEY

• VOICE COMMUNICATION SYSTEM
• TOWER CONSOLES

 

 INTERMEDIATE MODERNIZATION OF SMART PROJECT for ANKARA ESENBOGA and ISTANBUL ATATÜRK AIRPORTS – TURKEY



The project has been started at the middle of 2007 and completed at the end of 2007.
It covers Ankara Esenboga and Istanbul Atatürk Airport Intermediate Modernization Adaption of current systems to newly launched SMART project systems.



UPGRADE AIRFIELD SAFETY FRANGIBLE AIRFIELD FENCE & APPROACH LIGHT, RUNWAY ENDS CONTRUCTIONAL WORK– INCIRLIK AIRBASE -TURKEY


The project has been awarded by United States Air Force 39 CONS/LGC at the middle of 2007 and completed in February, 2008

 

 

 
Mainpage Contact Us Human Resources


Copyright © 2008 Kuanta All rights reserved.